Malad West metro station


Malad West
Mumbai Metro station
General information
LocationMalad, Ekta Nagar, Malad West, Mumbai, Maharashtra 400064
Coordinates19°11′08″N 72°50′09″E / 19.18542°N 72.83590°E / 19.18542; 72.83590
Owned byMumbai Metropolitan Region Development Authority (MMRDA)
Operated byMaha Mumbai Metro Operation Corporation Limited (MMMOCL)
Line(s)Line 2A
Platforms2 (2 side platform)
Tracks2
Construction
Structure typeElevated, Double track
Parkingyes (paid)[1]
History
Opened19 January 2023; 15 months ago (2023-01-19)
Services
Preceding station Mumbai Metro Following station
Valnai
towards Dahisar East
Line 2A Lower Malad
towards Andheri West
Location
Map

Malad West is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Malad, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.[2][3][4]

History[edit]

Trial runs on section of 2A from Dhanukarwadi to Dahisar East has started from 31 May 2021. Dahisar East commercial operations began on 3 April 2022 with First phase of line 2A.

Station layout[edit]

G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Andheri West next station is Lower Malad
Platform 1
Northbound
Towards ← Dahisar East next station is Valnai
Side platform | Doors will open on the left Disabled access
L2

Power and signaling system[edit]

Like all other stations and railways of Mumbai metro, Malad West station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References[edit]

  1. ^ "New Parking Facility To Be Introduced Near 5 Metro Stations In Mumbai". mumbailive.com. Retrieved 15 January 2024.
  2. ^ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
  3. ^ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.
  4. ^ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.