• Thumbnail for Dortmund–Soest railway
    Wanne-Eickel Main line to Bochum/Witten S-Bahn line to Witten S5 169.3 Schnettkerbrücke junction 170.1 Dortmund Signal-Iduna-Park* Connecting line to Rhenish...
    6 KB (371 words) - 16:57, 5 July 2022
  • Thumbnail for Bundesautobahn 40
    4-way interchange A 45 B 1 (43) Dortmund-Dorstfeld (44) Dortmund-Barop Schnettkerbrücke 328 m Dortmund Hombruch (planned) Intersection Dortmund Zentrum (planned)...
    6 KB (185 words) - 11:01, 7 November 2023