The Resolution class was a class of four nuclear ballistic missile submarines (SSBN) built for the Royal Navy as part of the UK Polaris programme. Each... 17 KB (1,722 words) - 23:35, 3 April 2024 |
Beginning in the late 1960s, the United Kingdom operated four Resolution-class submarines, each armed with sixteen US-built UGM-27 Polaris missiles. The... 26 KB (2,588 words) - 23:55, 3 April 2024 |
HMS Resolution (S22) was the first of the Royal Navy's Resolution-class ballistic missile submarines. She operated from 1968 until 1994 providing the UK... 7 KB (590 words) - 21:25, 7 November 2023 |
world's first turbine installation vessel Resolution-class submarine, of the British Royal Navy Resolution (1802 ship), a brig built in Spain and launched... 7 KB (835 words) - 13:43, 14 July 2023 |
HMS Repulse (S23) (category Resolution-class submarines) was a Resolution-class ballistic missile submarine of the Royal Navy. HMS Repulse was one of two Resolution-class ballistic missile submarines ordered... 5 KB (337 words) - 21:33, 7 November 2023 |
The Valiant class were a class of nuclear-powered fleet submarines in service with the Royal Navy from the mid-1960s until 1994. They were the first fully... 7 KB (530 words) - 21:12, 7 November 2023 |
The Type 214 is a class of diesel-electric submarines developed exclusively for export by Howaldtswerke-Deutsche Werft GmbH (HDW). It features diesel... 36 KB (3,254 words) - 09:14, 24 April 2024 |
HMS Revenge (S27) (category Resolution-class submarines) Resolution-class ballistic missile submarines. The four Resolution-class submarines were ordered on 8 May 1963, with Revenge, the fourth of the class... 8 KB (688 words) - 21:38, 7 November 2023 |