• Thumbnail for Tungsten
    maint: unfit URL (link) de Luyart, J.J. and F. (September 1783) "Análisis químico del volfram, y examen de un nuevo metal, que entra en su composición" (Chemical...
    78 KB (8,830 words) - 21:54, 6 May 2024
  • Thumbnail for South America
    1982, and Angra II, with capacity of 1,350 MW, connected in 2000. A third reactor, Angra III, with a projected output of 1,350 MW, is planned to be finished...
    213 KB (19,064 words) - 08:06, 15 May 2024
  • Thumbnail for Latin America
    1982, and Angra II, with capacity of 1,350 MW, connected in 2000. A third reactor, Angra III, with a projected output of 1,350 MW, is planned to be finished...
    329 KB (32,727 words) - 02:36, 11 May 2024
  • Thumbnail for Economy of Brazil
    1982, and Angra II, with capacity of 1,350 MW, connected in 2000. A third reactor, Angra III, with a projected output of 1,350 MW, is planned to be finished...
    114 KB (8,258 words) - 08:39, 16 May 2024
  • Thumbnail for Economy of South America
    1982, and Angra II, with capacity of 1,350 MW, connected in 2000. A third reactor, Angra III, with a projected output of 1,350 MW, is planned to be finished...
    101 KB (8,352 words) - 05:38, 18 April 2024
  • Thumbnail for Latin American economy
    1982, and Angra II, with capacity of 1,350 MW, connected in 2000. A third reactor, Angra III, with a projected output of 1,350 MW, is planned to be finished...
    104 KB (11,516 words) - 09:24, 9 May 2024