• Thumbnail for LVM3
    LVM3 (redirect from GSLV III)
    (previously referred as the Geosynchronous Satellite Launch Vehicle Mark III or GSLV Mk III) is a three-stage medium-lift launch vehicle developed by the Indian...
    79 KB (5,804 words) - 17:06, 22 April 2024
  • Thumbnail for Geosynchronous Satellite Launch Vehicle
    Satellite Launch Vehicle (GSLV) is a class of expendable launch systems operated by the Indian Space Research Organisation (ISRO). GSLV has been used in fifteen...
    25 KB (1,800 words) - 13:54, 20 February 2024
  • Thumbnail for List of GSLV launches
    Geosynchronous Satellite Launch Vehicle (GSLV) rockets. This list does not include LVM 3 (formerly known as GSLV Mk III) launches, which can be found here[broken...
    40 KB (1,834 words) - 11:21, 20 April 2024
  • (Centaur upper stage) CE-20 (cryogenic rocket engine for upper stage of GSLV-III) Anaerobic digestion Dark fermentation Photofermentation Syngas Generation...
    13 KB (1,225 words) - 09:17, 23 March 2024
  • Thumbnail for CE-20
    flight 'D1' of the GSLV Mk-III on 5 June 2017. On 25 January 2017, CE-20 engine E2 integrated with development stage for GSLV Mk III, C25 'D' was tested...
    27 KB (2,322 words) - 19:54, 26 March 2024
  • Thumbnail for Satish Dhawan Space Centre
    communications satellites of the class up to 2 tonnes. The next variant of GSLV is GSLV Mk III with its own cryogenic high-thrust engine and stage capable of launching...
    39 KB (3,867 words) - 02:45, 22 April 2024
  • Thumbnail for Indian National Satellite System
    semi-cryogenic engine, will boost GSLV's lift capability by 1 tonne". The Times of India. 8 June 2018. "GSLV MkIII-D2 successfully launches GSAT-29"....
    37 KB (2,955 words) - 23:44, 23 March 2024
  • Thumbnail for Gaganyaan-4
    September 2018. "ISRO GSLV Mark-III renamed as LVM-3". HT Tech. 2022-10-24. Retrieved 2023-05-08. "ISRO renames GSLV Mark-III as LVM-3". The Hindu. 2022-10-23...
    8 KB (1,502 words) - 17:54, 7 April 2024
  • Thumbnail for CE-7.5
    by the Indian Space Research Organisation to power the upper stage of its GSLV Mk-2 launch vehicle. The engine was developed as a part of the Cryogenic...
    8 KB (577 words) - 20:51, 24 February 2024
  • Thumbnail for Crew Module Atmospheric Re-entry Experiment
    Crew Module Atmospheric Re-entry Experiment (category Spacecraft launched by GSLV rockets)
    ‘Mini Orion’ GSLV Mark III Mission on Dec. 18 (Photos) Archived 2014-12-10 at the Wayback Machine Isro successfully test-fires GSLV Mark III carrying unmanned...
    13 KB (878 words) - 15:35, 17 February 2024