30806°W / 51.63917; -0.30806 The Aldenham Works, or Aldenham Bus Overhaul Works, was the main London Transport bus overhaul works. It was located on the edge... 19 KB (2,699 words) - 17:04, 30 December 2023 |
as Aldenham village itself. The village of Aldenham lies 3.5 miles (5.6 km) north-east of Watford and 2 miles (3.2 km) southwest of Radlett. Aldenham was... 12 KB (1,357 words) - 20:03, 1 May 2024 |
Edwin are bus mechanics at the huge London Transport bus overhaul works in Aldenham, Hertfordshire. During a miserably wet British summer lunch break... 12 KB (1,357 words) - 02:49, 8 January 2024 |
Edgware were halted. Works on the extension beyond Edgware were also stopped, although the construction of the new tube depot at Aldenham was completed and... 14 KB (1,755 words) - 22:49, 19 April 2023 |
Northern line (section Progress of works) Edgware to Brockley Hill, Elstree South and Bushey Heath with a new depot at Aldenham. The extension's route was that planned for the unbuilt Watford and Edgware... 88 KB (8,135 words) - 16:33, 5 April 2024 |
vehicles. The group was led by London Transport from their works at Chiswick, Aldenham Works and the new De Havilland factory at Leavesden, Hertfordshire... 42 KB (2,888 words) - 20:44, 16 April 2024 |
Elstree (section London Transport works) Golf Course, 3 miles (5 km) short of the runway. London Transport's Aldenham Works was sited on the edge of Elstree close to the A41; it was opened in... 57 KB (6,729 words) - 22:32, 5 April 2024 |
being Elstree South and Bushey Heath, both would have been near the Aldenham Works, London Transport's main bus overhaul depot. Brockley Hill station was... 13 KB (1,569 words) - 21:00, 18 March 2024 |