The MDK-2M was used for rapid digging of large coverages and for drawing tank trenches, with a digging depth up to 4.7 m width, and width 3.5 - 4m. The... 2 KB (145 words) - 12:43, 27 September 2023 |
Three-body problem (redirect from 3 body problem) {p_{1}} ^{2}}{2m_{1}}}+{\frac {\mathbf {p_{2}} ^{2}}{2m_{2}}}+{\frac {\mathbf {p_{3}} ^{2}}{2m_{3}}}.} In this case H {\displaystyle {\mathcal {H}}} is... 42 KB (5,358 words) - 04:18, 17 April 2024 |
C, G, 1, 2, 2M, 3–5 (PL7A & PL8A non-stop at level 2M) SL6 (Tower 1) & SL7 (Tower 2) (Parking & Podium Service Lift): P5-P1, 1, 2, 2M, 3–5 (SL7 non-stop... 41 KB (3,978 words) - 06:55, 12 April 2024 |
abandoned in 2024 but run in February at the same course Run at Haydock over 2m 3f in 2024, due to abandonment at Warwick. Run at Warwick in 2024, due to... 57 KB (564 words) - 16:55, 18 April 2024 |
BRDM-2 (redirect from BRDM-2M-96) Polish BRDM-2M-96 modernization and its successors, the BRDM-2M-96i, BRDM-2M-96ik "Szakal", BRDM-2M-96ik "Szakal Plus", BRDM-2M-97 "Żbik-B", BRDM-2M-97C "Żbik-P"... 85 KB (9,743 words) - 13:34, 13 April 2024 |
When k = 2m+1, i.e. odd, then |S2m+1−L|=S2m+1−L≤S2m+1−S2m+2=a(2m+1)+1{\displaystyle \left|S_{2m+1}-L\right|=S_{2m+1}-L\leq S_{2m+1}-S_{2m+2}=a_{(2m+1)+1}}... 7 KB (1,275 words) - 08:37, 12 April 2024 |
HL-2M is a research tokamak at the Southwestern Institute of Physics in Chengdu, China. It was completed on November 26, 2019 and commissioned on December... 2 KB (98 words) - 02:28, 28 August 2023 |