• Thumbnail for Siemens Mireo
    The Siemens Mireo is a family of electric multiple units (EMU) designed by Siemens Mobility. It is designed to be a successor to the "Mainline" variant...
    8 KB (694 words) - 11:44, 16 April 2024
  • Thumbnail for Battery electric multiple unit
    from April 2024 on electrified and unelectrified track, the 120 seat Siemens Mireo Plus B battery-powered/overhead power line trains. On only battery operation...
    41 KB (4,492 words) - 19:13, 9 May 2024
  • Siemens Mobility is a division of Siemens. With its global headquarters in Munich, Siemens Mobility has four core business units: Mobility Management,...
    21 KB (1,191 words) - 15:12, 4 June 2024
  • operated by new Siemens Mireo rolling stock. A corresponding contract for 57 three-part sets was signed between DB Regio AG and Siemens in August 2017...
    49 KB (4,446 words) - 13:58, 29 May 2024
  • 2019 and 40,0000 cycles at 10C by 2022. At that stage it was used in Siemens Mireo Plus B battery-electric trains, operating since 2024, where it replaced...
    19 KB (1,887 words) - 02:31, 25 April 2024
  • Thumbnail for List of Deutsche Bahn AG locomotives and railbuses
    450 GT8-100C/2S Stadtbahn Karlsruhe Retired 462 Siemens Desiro HC Regional services 463 Siemens Mireo S-Bahn Services: Rhine-Neckar, S-Bahn Mitteldeutschland...
    27 KB (151 words) - 12:13, 21 May 2024
  • Finsterwalde (Niederlausitz) – Calau (Nl) – Cottbus 215 Every 2 hours Siemens Mireo DB Regio Nordost RE 11 Leipzig Hbf – Taucha – Eilenburg – Torgau – Beilrode –...
    59 KB (104 words) - 01:08, 12 April 2024
  • Thumbnail for Stuttgart-Bad Cannstatt–Nördlingen railway
    operations on 9 June 2019, Stadler FLIRT multiple units have been used. Siemens Mireo electric multiple units are operated by Go-Ahead Bayern between Aalen...
    24 KB (2,916 words) - 01:40, 28 July 2023
  • Donauwörth–Treuchtlingen Munich–Augsburg 920, 910, 980 Go-Ahead Bayern Siemens Mireo (463) Siemens Desiro HC (462) RB 80 Some trains in the peak Mainfrankenbahn...
    78 KB (413 words) - 23:36, 24 April 2024
  • of 2009 to 2022. Since the timetable change in December 2022, Siemens Mireo and Siemens Desiro HC multiple units have been used for the services operated...
    17 KB (1,746 words) - 14:03, 2 April 2024