• Thumbnail for Work breakdown structure
    A work-breakdown structure (WBS) in project management and systems engineering is a deliverable-oriented breakdown of a project into smaller components...
    25 KB (3,157 words) - 20:22, 7 June 2024
  • Breakdown structure may refer to: In project management, these are often project components visualised in hierarchical form: Goals breakdown structure...
    801 bytes (121 words) - 23:26, 16 May 2023
  • In project management under the PRINCE2 methodology, a product breakdown structure (PBS) is a tool for analysing, documenting and communicating the outcomes...
    3 KB (293 words) - 13:30, 8 July 2023
  • Thumbnail for Organizational chart
    organigram, organogram, or organizational breakdown structure (OBS), is a diagram that shows the structure of an organization and the relationships and...
    8 KB (922 words) - 16:31, 30 March 2024
  • A Risk Breakdown Structure (RBS) within risk management is a hierarchically organised depiction of the identified project risks arranged by category....
    17 KB (2,426 words) - 07:40, 17 May 2023
  • A value breakdown structure (VBS) is a project management technique introduced by Stephen Devaux as part of the total project control (TPC) approach to...
    5 KB (701 words) - 01:07, 1 December 2023
  • In project management, the resource breakdown structure (RBS) is a hierarchical list of resources related by function and resource type that is used to...
    4 KB (553 words) - 00:21, 4 July 2021
  • The goals breakdown structure (GBS) is a hierarchical structure linking high-level objectives or goals to more detailed goals. The GBS was originally...
    6 KB (903 words) - 15:40, 15 April 2023
  • work breakdown structure (WBS), other decomposition techniques and tools are: organization breakdown structure (OBS), product breakdown structure (PBS)...
    76 KB (8,917 words) - 10:23, 26 May 2024
  • Thumbnail for Structure chart
    A structure chart (SC) in software engineering and organizational theory is a chart which shows the breakdown of a system to its lowest manageable levels...
    6 KB (700 words) - 00:35, 20 March 2024