• The Kanjari BoriyaviVadtal line belongs to Vadodara division of Western Railway zone in Gujarat State. KanjariVadtal branch line was opened in 1929....
    2 KB (93 words) - 06:19, 19 May 2024
  • The Harbour line is a branch line of the Mumbai Suburban Railway operated by Central Railway. It was named so because it catered to the eastern neighbourhoods...
    17 KB (1,111 words) - 16:37, 19 May 2024
  • The Central line of the Mumbai Suburban Railway is a public transit system serving Mumbai, Maharashtra, India. It consists of 24 stations from Chhatrapati...
    18 KB (906 words) - 16:46, 19 May 2024
  • Thumbnail for Mumbai Suburban Railway
    Western Line and CR operates the Central Line, Harbour Line, Trans-Harbour Line, Vasai–Roha Line and Neral–Matheran & Panvel–Karjat line. The Central Line in...
    62 KB (6,811 words) - 00:09, 30 March 2024
  • Thumbnail for List of high-speed railway lines in India
    railway lines in India. The Indian Ministry of Railways has classified railway line speeds into seven categories: Conventional lines: The routes which support...
    8 KB (682 words) - 12:41, 5 March 2024
  • Express trains halt at Kanjari Boriyavi Junction railway station. Kanjari Boriyavi Junction railway station is also connected to Vadtal by rail. Name of railway...
    4 KB (228 words) - 01:59, 1 January 2024
  • The Western line of the Mumbai Suburban Railway is a public transit system serving Mumbai Metropolitan Region, Maharashtra. It consists of 37 stations...
    28 KB (1,947 words) - 06:01, 20 May 2024
  • Thumbnail for Bhusawal railway division
    railway division. Milestones In 1853, the Survey for extension of Mumbai-Thane line beyond Igatpuri towards Khandesh was completed. By 1860, the Bhusawal Station...
    11 KB (832 words) - 12:12, 11 February 2024
  • Thumbnail for Western Railway zone
    line Ahmedabad–Mumbai main line Ahmedabad–Delhi main line Jaipur–Ahmedabad line Udhna–Jalgaon line Gandhidham–Ahmedabad main line Viramgam–Okha line...
    22 KB (2,315 words) - 09:05, 24 April 2024
  • Thumbnail for Matheran Hill Railway
    construction began in 1904. The consulting engineer was Everard Calthrop. The line was open to traffic by 1907. Its tracks were originally 30 lb/yd (14.9 kg/m)...
    14 KB (1,117 words) - 20:05, 3 January 2024