• Thumbnail for PDCA
    PDCA or plan–do–check–act (sometimes called plan–do–check–adjust) is an iterative design and management method used in business for the control and continual...
    14 KB (1,686 words) - 17:25, 24 May 2024
  • Look up PDCA in Wiktionary, the free dictionary. PDCA is plan–do–check–act or plan-do-check-adjust, an iterative four-step management method. PDCA may also...
    389 bytes (81 words) - 20:19, 14 January 2023
  • also known as the Shewhart cycle, Deming cycle, or PDCA. Another technique used in conjunction with PDCA is the five whys, which is a form of root cause...
    26 KB (3,208 words) - 15:01, 13 June 2024
  • Thumbnail for Prime Minister of the United Kingdom
    November 2023 that former prime minister David Cameron would not claim from the PDCA while he is Foreign Secretary. Timeline of prime ministers of Great Britain...
    53 KB (5,905 words) - 18:56, 2 June 2024
  • review, and further action is required. It can be seen that both fit into the PDCA (plan-do-check-act) philosophy as determined by the Deming-Shewhart cycle...
    10 KB (1,279 words) - 16:33, 25 January 2024
  • and easiest solutions Test solutions using plan-do-check-act (PDCA) cycle Based on PDCA results, attempt to anticipate any avoidable risks associated...
    8 KB (1,033 words) - 10:56, 18 December 2023
  • is happening now. The principles of PDCA are heavily embedded into the Hoshin Kanri planning process. Beyond PDCA, Joseph M. Juran also played a role...
    6 KB (594 words) - 07:33, 30 March 2024
  • Thumbnail for Continual improvement process
    much flexibility is valuable in the process to meet changing needs. The PDCA (plan, do, check, act) or (plan, do, check, adjust) cycle supports continuous...
    12 KB (1,250 words) - 19:54, 29 April 2024
  • Thumbnail for OODA loop
    Decision cycle Double-loop learning Feedback loop Improvement cycle DMAIC PDCA Learning cycle Maneuver warfare Mental model Nursing process Problem solving...
    6 KB (532 words) - 12:33, 12 January 2024
  • organisation. The 2002 version of BS 7799-2 introduced the Plan-Do-Check-Act (PDCA) (Deming cycle), aligning it with quality standards such as ISO 9000. BS...
    4 KB (491 words) - 05:11, 27 February 2024